Well progress is rapidly taking place on Song Dog. The slab has been given three coats of epoxy paint.
The outer walls are up.
The OSB under-siding is being installed
The garage door has been delivered. It is 9x7 and is insulated and the best of the three choices as far as thickness of metal and thickness of insulation.
The hardi plank siding will be going up this weekend.
I have decided on red as the overall color and perhaps white trim around the four windows.
I will be using a window airconditioning unit to begin cooling the cave.
I would like to post pictures but haven't learned how to do so at this point but will investigate it further.
All for now.
Philip and Max(lHead of Ranch Security)
Song Dog, Texas